Two entrances will be constructed to the Soukka metro station, one on Soukantori and the other in Yläkartanontie. In connection with the excavation of the Soukantori entrance, a wing of a commercial building at Soukantie 14 will be demolished. Preparations for the demolition will begin on 2 May. All demolition works will be performed in indoor and basement areas.
We apologise for any inconvenience caused.
Further information:
Skanska Infra Oy, responsible Site Manager Lauri Harri, lauri.harri(at)skanska.fi, worksite telephone +358 50 560 9092
Länsimetro feedback phone number (Mon–Fri 9.00–15.00), tel. +358 50 377 3700